How long does it take to produce a licensed card game?
Factory and freight time for a finished card game is published differently by different companies: Stonemaier Games, a board game publisher, plans 3 to 4 months in the factory plus 1 to 2 months of freight, while manufacturer Hero Time lists 30 to 90 days of mass production plus about 30 to 40 days by sea to the US West Coast. Design, playtesting and licensor approvals come before that, and a large TCG can take over two years in total: Riot began Riftbound in 2023 and released it in English on 31 October 2025.
The stages
| Stage | Typical duration | Source |
|---|---|---|
| Rights and contract | Varies; no reliable public figure | n/a |
| Concept and pitch to licensor | Depends on scope | n/a |
| Licensor review, each stage | 10 to 14 business days per review (some licensors about 5 working days) | Legal Moves; Astrid Lindgren Company |
| Design, rules, card layouts, playtesting | Depends on game size and number of cards | n/a |
| Artwork setup at the factory | 5 to 30 days | Hero Time (manufacturer) |
| Pre-production sample (card game) | About 7 days, plus 5 to 20 days to ship it to you | Hero Time (manufacturer) |
| Mass production, as one manufacturer publishes it | 30 to 90 days (card games at the short end) | Hero Time (manufacturer) |
| Factory time, as one publisher plans it | Minimum 3 months, usually 3.5 to 4 | Stonemaier Games (publisher) |
| Sea freight China to US West Coast | About 30 to 40 days | Hero Time (manufacturer) |
| Freight stages to retailers | 1 to 2 months | Stonemaier Games (publisher) |
Why the factory figures differ
The two factory figures do not contradict each other. They come from different companies and describe different things: Hero Time publishes its own mass production time as a manufacturer, with simple card games at the short end, while Stonemaier Games publishes how long it plans for manufacturing as a board game publisher. Plan with the figure your own manufacturer quotes for your specs.
Why licensed games take longer than original games
Every key step needs the IP holder's sign-off. Licensors approve the concept, then a pre-production sample, then final production samples (Legal Moves; Astrid Lindgren Company). If a review sends you back, the clock restarts for that stage. With anime, timing also depends on the show: rights are often allocated 12 to 18 months before broadcast (Vitrina), so a game timed to a new season must be agreed early.
Two public examples
- Riftbound (League of Legends TCG): development began in 2023, announced December 2024 as Project K, released in China in August 2025 and in English on 31 October 2025 (Wikipedia).
- CookieRun: Braverse: revealed 1 September 2023, first booster planned for October 2023, wider rollout from February 2024 (Devsisters), Europe in January 2027 (GamersHeroes).
These are large TCGs. A single boxed card game with a fixed deck needs far less design and testing time, but the factory, freight and approval steps are the same.
How to shorten it
- Send print-ready files. Artwork setup alone ranges from 5 to 30 days depending on file quality (Hero Time).
- Agree the approval contacts and review windows in the contract.
- Book factory time early. Hero Time notes that choosing a longer lead time can lower costs, so plan rather than rush.
- Launch with fixed decks before randomized boosters.
At Learn2Spiel we give IP holders a plan in the first conversations, because timing depends on the game and on the approvals it needs (see How we work).
Frequently asked questions
How long does card game manufacturing take?
It depends on the manufacturer. Hero Time publishes about 30 to 90 days of mass production; Stonemaier Games, a board game publisher, plans 3 to 4 months in the factory.
How long does shipping from China take?
About 30 to 40 days by sea to the US West Coast (Hero Time), and Stonemaier Games plans 1 to 2 months for all freight stages to retailers.
How long does a licensor take to approve?
Board game agreements commonly allow 10 to 14 business days per review, with about three review stages.
Can a licensed card game be ready for a convention in 3 months?
Only if design, approvals and files are already finished. Factory and freight alone are about 4 to 6 months in Stonemaier Games' planning.
How long did Riftbound take?
Development began in 2023; English release was 31 October 2025.
Sources
- Manufacturing minimum 3 months, usually 3.5 to 4; freight 1 to 2 months; ocean 4 to 6 weeks (Stonemaier Games, publisher)
- Artwork setup 5 to 30 days; card game sample about 7 days plus 5 to 20 days shipping; mass production 30 to 90 days; sea 30 to 40 days (Hero Time, manufacturer)
- Longer lead time can reduce costs; simple card game production 30 days (Hero Time)
- 10 to 14 business days per review; three approval stages (Legal Moves)
- About 5 working days per review at one licensor (Astrid Lindgren Company)
- Anime rights allocated 12 to 18 months before broadcast (Vitrina)
- Riftbound dates (Wikipedia)
- CookieRun: Braverse dates (Devsisters)
- CookieRun: Braverse Europe release (GamersHeroes)